State-of-the-smart wall framing
Pre Framing provides partially pre-fabricated walls, which we call pre-framed walls. These are pre-cut and pre-marked studs held together with collapsible alloy strap fastened on the wood. We do this using our proprietary automated machinery and software.
Our walls are consistently accurate, collapsible for easy shipping and logistic, and expandable on-site.
Pre-framed walls are NOT prefab walls or a new construction method. Pre-framing simply speeds up the traditional on-site process.
Our walls are consistently accurate, collapsible for easy shipping and logistic, and expandable on-site.
Pre-framed walls are NOT prefab walls or a new construction method. Pre-framing simply speeds up the traditional on-site process.
Our proprietary software program and a small spacing and cutting CNC machine are the basis of our service+product. The system is based on our innovative pre-framing technology. It enables a big leap forward in precision and efficiency, allowing walls to be raised up to 10x faster.
We are offering the following service to Home Builders, General and Framing Contractors:
1) detailed shop drawings.
2) delivery on-site of: pre-framed walls, pre-cut headers and plates.
This system provides similar advantages in terms of speed and precision of traditional pre-fab walls, but is significantly less expensive than any existing prefab method, because it is an automatic = low cost process, that does not requires:
- A large facility and expensive manufacturing equipment;
- A crane for installation;
- Extra transportation cost (to ship entire walls is inefficient).
- A crane for installation;
- Extra transportation cost (to ship entire walls is inefficient).
This technology automates the most complex and time consuming manual steps of the framing process dramatically saving time. It is a powerful tool and it is very easy to use for any crew.
Advantages for Home Builders / General Contractors / Developers:
- Extra margin;
- Faster construction
- Less mistakes down the line = extra time/money saved;
- Easy! = stress free process and shorter days, less time required to fix issues;
- Only 2 hours training.
- Less accidents (slower pace, less people concentrated in one place, less tired crews) = Less potential risk.
- Extra margin;
- Faster construction
- Less mistakes down the line = extra time/money saved;
- Easy! = stress free process and shorter days, less time required to fix issues;
- Only 2 hours training.
- Less accidents (slower pace, less people concentrated in one place, less tired crews) = Less potential risk.